Customization: | Available |
---|---|
Certification: | CE, ISO |
Spray Volume: | 1.0~2.0ml/80cm2/H |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Applicable Industries:
Salt Spray Tester is used to test the anti-erosion quality of the surface of all materials after the rust-proof of painting, coating, electroplating, anoding and rust-proof of greasing.anti corrosion treatment for a variety of materials, corrosion resistance of their products.
Specifications:
1.The Salt Spray Test Machine is made of transparent materials so that the operator can see the tested sample in it and the spraying situation of the tested sample.
2. A waterproof structure is adopted between the chamber cover and chamber body, thus there is no salt spray overflow.
3.Adopts the tower spraying system and equipped with the salt solution filter system and non-crystal nozzle so as to realize even salt spray distribution and freely adjustable settlement.
4.Control System High precision P.I.D. temperature control meter with its error ±0.1°C.
Model | XB-OTS-60 | XB-OTS-90 | XB-OTS-120 | XB-OTS-160 | XB-OTS-200 |
Inner size (cm) | 60x45x40 | 90x60x50 | 120x80x50 | 160x100x50 | 200x120x60 |
External size(cm) | 107x60x118 | 141x88x128 | 190x110x140 | 230x120x140 | 270x150x150 |
Inside temp |
Brine test method(NSS ACSS)35°C±1°C/Corrosion resistance test method (CASS)50°C±1°C |
||||
Brine temp | 35°C±1°C 50°C±1°C | ||||
Test chamber volume | 108L | 270L | 480L | 800L | 1440L |
Brine chamber volume | 15L | 25L | 40L | 40L | 40L |
Compressed air pressure | 1.00±0.01kgf/cm2 | ||||
Spray volume | 1.0~2.0ml/80cm2/h (Collect at least 16 hours, the average) | ||||
Test room relative humidity | 85%RH or more | ||||
PH | 6.5~7.2 3.0~3.2 | ||||
Spray method | Programmable spray (including the continuous spray interrupted spray) | ||||
Power | AC220V1Φ10A | AC220V1Φ15A | AC220V1Φ20A | AC220V1Φ20A | AC220V1Φ30A |
Features:
*Automatic / manual water system has automatically add the water level of the water level is low, the test is not interrupted. Water level is insufficient warning to ensure that the use of safety.
*Precision glass nozzle (PYREX) made of special glass, mist spread evenly and naturally fall on the specimen, and 4000 hours of continuous use, and to ensure that no crystalline salt obstruction.
*Attached double over-temperature protection, over-temperature warning display, and cut off the heater power to ensure that the use of safety.
*Inlet temperature controller using a digital display, PID control, error of ± 0.1 ° C.
*Laboratory using direct steam heating, heating up fast, and even reduce the standby time, heating tubes with high corrosion-resistant titanium tubing.
*Spray tower attached to the conical dispersion, with oriented fog, the function of regulating the amount of fog and uniform loading amount of fog.
*The saturated air barrel using Henry's law, be heated humidification, and provide the required humidity of the laboratory. Its made of SUS # 304 stainless steel insulation effect, with visual connectivity and drainage switch, in order to visually saturated air the barrel water level and cleaning.
*With automatic defogging device that can clearly watch the specimen in test chamber.
*Fog sealing sink, water seal to prevent fogging leakage.
*Laboratory sealing cover material for Taiwan imported PVC board, pneumatic cylinder automatic lifting way, easy to operate safe and reliable.
*The import timer using digital display, accurate timekeeping, H. M. seconds S can be segmented set any required test time, adjust the time range from 0.01 seconds to 9999 hours. * Reagent supplement bottles hidden attached water level viewing window, easy to clean and should not be broken.
*Laboratory basket rack using plane indexing rack, can arbitrarily adjust the angle, four off the fog, and the fog direction completely consistent.
Corresponding Standard:
GB11158 GB10589-89 GB10592-89 GB/T10586-89 GB/T2423.22-2001
GB/T2423.1-2001 GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93 ASTM D1735
IEC60068-2-1.1990 IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C EIA - 364-59
Product View of salt spray test chamber:
Packing&Shipping:
Packaging Details:Strong wooden case for salt spray test chamber
Delivery Detail: 20 days after getting the payment or Spot
Our Services:
We are here to help you. Services available:
Replacement manuals
If you have an OTS chamber , we will do our best to help you in whatever way we can.
Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
Our Company
OTS (Overall Testing System)
Was established in 1978, with 35 years' history
With 30,000 square meter salable production base and 120 employees
Is one of the leading companies solely dedicated to manufacture of
Environmental Simulation Test Chambers ,Physical Testing Equipment .
(such as constant temperature and humidity chambers, environmental chambers, climatic test chambers, rain and dust test chambers,thermal shock test chambers,fast change rate chambers, salt spray chamber,UV test chambers,walk in test chambers and other special customized test chambers ; tensile testing machine, vibration test machine ,carton compression testing machines, bursting strength testing machine etc.) ..
OTS has the equipment and expertise, with own R&D and consultant team, to meet and exceed your testing requirement. with offices in unrivaled quality advantage, dynamic management team with superb manufacturing process,also the quality with the world norms: ISO , ASTM, DIN, EN, GB, BS, JIS, ANSI, UL,CE, TAPPI, AATCC, IEC, VDE...
FAQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.Hot selling lab electronic temperature humidity cabinet/Environmental climate test chamber also can be customized.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it
Thirdly, some of customized chambers we should to install and teach your team to operate .
If you want to know more information...
Please leave a message below and click " SEND "
Thanks for your time and attention~Thank you!