Customization: | Available |
---|---|
Certification: | CE, TUV, ISO, CE, ISO, RoHS |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Applicable Industries:
Laboratory Climatic Used Fast Temperature Change Thermal Shock Test Chamber used to test the material structure or composite material in an instant by the extremely high temperatures and very low temperature continuous environment which can endure the degree of order in the shortest possible time to test its thermal expansion and contraction caused by chemical changes physical harm.
The applicable the object material, including metals, plastics, rubber, electronic, ..., etc., can be used as the basis of its product improvement or reference.
Inner size selection
Model | XB-OTS-50 | XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 |
Inner size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External size WxHxD(cm) | 138x180x155 | 150X190X160 | 190x200X195 | 210x220X205 | 225x250x220 |
Features:
*.High-texture appearance, the body adopted an arc shape, surface matte stripes processing, and flat-handle, easy to operate, safe and reliable.
*.Rectangular multi-layer glass View window, the use of guinea pigs observed in the test window with anti-sweat heaters device prevents water gas condensate ,Knot, water droplets, PL fluorescent lamps to keep the inside lighting.
*.Door bunk isolated airtight packing, can be effectively isolated from the internal temperature of the leak
*.Compressor cycling system used France"Tecumseh"brand which can effectively remove condenser pipe and between capillary Lubricating oil and whole series adopt environmental protection refrigerant (R23, R404, R507)
*.Controller uses the imported LED display screen, can display measured values and setting time
*.Controller with multi-segment program editor and temperature and humidity can be fast (OUICK) or slope (SLOP) controlled.
*.Built-in mobile wheels allow easy movement and placed and has a strong positioning screw position.
Detail Specification
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ | ±0.5°C / ±2.0°C | ||||
distribution accuracy | |||||
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate | ||||
+ spray painting for external chamber. | |||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / | ||||
hermetic two-stage compressor (air-cooled). | |||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, | ||||
refrigerant pressure protection switch failure warning system, electronic siren. | |||||
Fitting | Outlook window (special purchase), the upper and lower adjustable | ||||
compartment two energized measured line hole, casters,level bracket. | |||||
Power | 3 phase AC380V 50HZ/60HZ | ||||
Controller | Tanwan TATO or TH900C | ||||
Compressor | Germany Bitzer Brand |
GB11158 GB10589-89 GB10592-89 GB/T10586-89 GB/T2423.22-2001 GB/T2423.1-2001 GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93 ASTM D1735 EIA - 364-59
IEC60068-2-1.1990 IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C
Product View Of Cold and hot Temperature Thermal Shock Impact Test Chamber
Packing & Shipping
Replacement manuals
If you have an OTS chamber , we will do our best to help you in whatever way we can.
Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it
Thirdly, some of customized chambers we should to install and teach your team to operate .
If you want to know more information...
Please leave a message below and click " SEND "
Thanks for your time and attention~Thank you!