Customization: | Available |
---|---|
Certification: | CE, ISO |
Temp. Deviation: | +/- 0.5 Degree C |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction:
Rapid Rate Change Temperature Test Chamber is widely applied for quality inspection for all types of electric products, electric appliance, and products from communication, instrument, automobile, plastic, metal, food, chemical, building materials, medical and aerospace industries by constant high low temperature change, damp heat etc environment simulation reliability test.
Specification:
XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 | XB-OTS-800 | XB-OTS-1000 | |
Inner size W*H*DCM |
40*50*40 | 50*60*50 | 50*75*60 | 60*85*80 | 100*100*800 | 100*100*100 |
External size W*H*DCM | 90*143*100 | 100*153*110 | 110*168*110 | 130*178*120 | 150*193*140 | 150*193*160 |
Temperature range | -70°C~+150°C(180°C) (A:-20°C B:-40°C C:-60°C D:-70°C ) |
|||||
Humidity range | 20%~98%R.H.(10%-98%R.H/5%~98%R.H) | |||||
Temp humidity analytic accuracy / uniformity |
±0.1°C;±0.1%R.H./ ±1.0°C;±3.0%R.H.is special optional condition. | |||||
Temperature humidity control accuracy/fluctuation |
±1.0°C;±2.0%R.H./ ±0.5°C;±2.0%R.H. | |||||
Heat/cooling time | About 5.0°C/min;about 1.2°C/min (5~20°C/min is a special optional condition) | |||||
Inner and outer materials | SUS#304 Stainless steel for inner chamber and Carton Advanced cold plate nano paint for outer. | |||||
Insulation materials | Resistant to high temp ,high density,formate chlorine,ethyl acetum foam insulation materials | |||||
Cooling system | Air cooling/single segment compressor(-20°C) ,air and water double segment compressor (-40°C~-70°C) |
|||||
Protection devices | Fuse switch, compressor overload switch, refrigerant high and low pressure protection switch, super humidity over-temperature protection switch, fuse, failure warning system |
|||||
Parts | Watching window,50mm testing hole,PL internal bulbs,partition plate,dry and wet ball gauze | |||||
Controller | TEMI" South Korea"TEMI" "OYO" Japan's "OYO" Brand optional | |||||
Compressor | Original France"Tecumseh"brand | |||||
Power | 1Φ 220VAC±10% 50/60Hz & 3Φ 380VAC±10% 50/60Hz |
Features:
1.Reasonable structural design, rapid cooling rate.
2. Imported refrigeration system, internal with SUS#304 high temperature resistant stainless steel.
3. More than 30% energy saving is achieved.
4. The test specimen can be easily observed via observation window,
5. Easy to Operate, install and maintain.
6.ational Construction and fast cooling rate
7.Frequency conversion control of wind speed.
8.Adopts international brand of imported parts for cooling system to improve operation reliability
9.Touch screen controller, friendly Man-Machine interface and safety device to ensure simple operation and easy maintenance.
10.Standards Implemented and met
11.GB10592-89 Technical requirements for high and low temperature test chamber
12.GB2423.1-1989 Low temperature test
13.GB2423.2-1989 High temperature test mode
Standard:
GB/Bb T2423.2-89 high temperature test method GB2423.1-89 test A: low temperature test method 6
Ab IEC60068-2-1 low temperature test method GJB150.4-1986 test at low temperature
EIA - 364-59 test at low temperature IEC60068-2-38 temperature cycle
IEC60068-2-78 constant temperature IEC60068-2-30 temperature cycle
EIA - 364-31C temp resistance GB/T2423.3 constant heat test method
The production process of the test chambers :
Our Services:
We are here to help you. Services available:
Replacement manuals
If you have an OTS chamber , we will do our best to help you in whatever way we can.
Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.Hot selling lab electronic temperature humidity cabinet/Environmental climate test chamber also can be customized.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it
Thirdly, some of customized chambers we should to install and teach your team to operate .
If you want to know more information,
please leave a message below. Thank you~