Customization: | Available |
---|---|
Certification: | CE, TUV, ISO, CE, ISO, RoHS |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications:
Model | XB-OTS-50 | XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 |
Inner size WxHxD(cm) | 36×40×35 | 40×50×40 | 50×60×50 | 60×75×50 | 80×85×60 |
External size WxHxD(cm) | 148x175x160 | 150X175X165 | 155x185X165 | 165x200X175 | 185x210x185 |
Shock Temperature ragne | -65°C~150°C | ||||
Heating up time | RT~200°C about 35min | ||||
Cooling down time | RT~-70°C about 90min | ||||
Temp recover time/change time | ≤5min / ≤10sec | ||||
Temp control accuracy/ distribution accuracy |
±0.5°C / ±2.0°C | ||||
Inner materials | SUS 304# stainless steel plate for inner chamber,and stainless steel plate + spray painting for external chamber. |
||||
Insulation materials | High-temperature high-density amino acid ethyl ester foam insulator material. | ||||
Systems | P.I.D+S.S.R+Microcomputer balanced temperature control system. | ||||
Cooling systems | Semi-hermetic two-stage compressor (water-cooled) / hermetic two-stage compressor (air-cooled). |
||||
Safety devices | Fuse switch, high and low pressure protection switch compressors, refrigerant pressure protection switch failure warning system, electronic siren. |
||||
Fitting | Outlook window (special purchase), the upper and lower adjustable compartment two energized measured line hole, casters,level bracket. |
||||
Power | 3 phase AC380V 50HZ/60HZ | ||||
Controller | Tanwan TATO or TH900C | ||||
Compressor | Germany Bitzer Brand |
Main parts of thermal shock test chamber:
Global safety design, use our chambers safely and with peace of mind for many years to come.
We deliver chambers that conform to international safety standards.
Our chambers conform to ISO risk assessment as well as global safety design electrical safety standards such as CE marking and EMC directive.
GB11158 GB10589-89 GB10592-89 GB/T10586-89 GB/T2423.22-2001
GB/T2423.1-2001 GB/T2423.2-2001 GB/T2423.3-93 GB/T2423.4-93 ASTM D1735
IEC60068-2-1.1990 IEC60068-2-2.1974 IEC 68-2-30 IEC68-2-03 EIA - 364-31C
EIA - 364-59
Packing &Shipping:
Packaging Details:Strong wood case for Thermal shock tester from OTS.
Delivery Detail: 20 days after getting the payment or Spot
Our Services:
We are here to help you. Services available:
Replacement manuals
If you have an OTS chamber , we will do our best to help you in whatever way we can.
Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
Our Company
OTS (Overall Testing System)
Was established in 1978, with 35 years' history
With 30,000 square meter salable production base and 120 employees
Is one of the leading companies solely dedicated to manufacture of
Environmental Simulation Test Chambers ,Physical Testing Equipment .
(such as constant temperature and humidity chambers, environmental chambers, climatic test chambers, rain and dust test chambers,thermal shock test chambers,fast change rate chambers, salt spray chamber,UV test chambers,walk in test chambers and other special customized test chambers ; tensile testing machine, vibration test machine ,carton compression testing machines, bursting strength testing machine etc.) ..
OTS has the equipment and expertise, with own R&D and consultant team, to meet and exceed your testing requirement. with offices in unrivaled quality advantage, dynamic management team with superb manufacturing process,also the quality with the world norms: ISO , ASTM, DIN, EN, GB, BS, JIS, ANSI, UL,CE, TAPPI, AATCC, IEC, VDE...
FAQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.Hot selling lab electronic temperature humidity cabinet/Environmental climate test chamber also can be customized.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it
Thirdly, some of customized chambers we should to install and teach your team to operate .
If you want to know more information...
Please leave a message below and click " SEND "
Thanks for your time and attention~Thank you!