Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber

Product Details
Customization: Available
Power Supply: 220V / 380V, 50Hz / 60Hz
Certification: CE, TUV, ISO, CE, ISO, ASTM
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Fast Delivery
The supplier can deliver the goods within 15 days
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
ISO45001:2018 certificate
ISO14001
to see all verified strength labels (27)
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
  • Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber
Find Similar Products

Basic Info.

Model NO.
XB-OTS-408
Warranty
1 Year
Application
Industry, School, Hospital, Lab
Customized
Customized
Structure
Vertical Model
Material
SUS 304 Stainless Steel
Type
Environment Test and Measurement Instruments
Temperature Range
-70 Centigrade Degree to +150
Humidity Range
20% ~ 98%
RS 232 Interface
Connect to PC
Refrigerant
Environmental Friendly R23/R404A
Power
Electronic
Usage
Temperature Humidity Test
Controller
Programmable LCD Touch Screen
Certificate
CE SGS ASTM
Cable Port
External Power
Transport Package
Strong Plywood Case
Specification
(W*H*D)100*100*80CM
Trademark
OTS
Origin
China
HS Code
8479899990
Production Capacity
268 Set/Month

Product Description

Environmental High low alternating Fast Temperature Change Cycle test Chamber

Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber

Product Description

Electronics Lab Environmental Temperature Humidity Test Chamber is for testing material heat, cold, dry resistance, humidity resistance.Suitable for electronics, electrical appliances,Communications, instrumentation, vehicles, plastic products, metal, food, chemical,building materials, medical, aerospaceand other products.
Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber


The main technical parameters
Model # XB-OTS-80 XB-OTS-150 XB-OTS-225 XB-OTS-408 XB-OTS-800 XB-OTS-1000
Internal Dimensions
( W x H x D cm)
40*50*40 50*60*50 60*75*50 80*85*60 100*100*80 100* 100 *100
Internal Volume (L) 80L 150L 225L 408L 800L 1000L
External Dimensions
( W x H x D cm)
90*143*100 100*153*110 110*168*110 130*178*120 150*193*140 150*193*160
Appro Weight (Kg) 190kg 260kg 320kg 420kg 540kg 570kg
Temperature Range Temp Range from -70°C to 150°C(180°C) is available on request
(A:-20°C B:-40°C C:-60°C D:-70°C )
Humidity Range 20%~98%R.H.(10%-98%R.H/5%~98%R.H)  (5 ~ 10% is available on request)
Heat/cooling rate About 5.0°C/min;about 1.2°C/min (5~10°C/min is a special optional condition )
Temperature  humidity
analytic accuracy / uniformity
≤±0.1°C; ≤±0.1%R.H./  ≤±1.0°C; ≤±3.0%R.H.is special optional condition.
Temperature  humidity
control accuracy / fluctuation
≤ ±1.0°C; ≤±2.0%R.H./  ≤±0.5°C; ≤±2.0%R.H.
Inner and outer materials SUS#304 Stainless steel for inner chamber and Carton Advanced cold plate nano paint for outer.
Thermal Insulation Material Resistant to high temp ,high density,formate chlorine,ethyl acetum foam insulation materials
Controller " HT-900C " South Korea"TEMI" "OYO" Japan's "OYO" Brand  optional
Refrigerating Unit Original France"Tecumseh"brand
Original Germany "Bitzer" brand
Cooling system Air cooling/single segment compressor(-20°C) ,air and water double segment compressor
(-40°C~-70°C)
Safety Devices Fuse switch, compressor overload switch, refrigerant high and low pressure protection switch,
super humidity over-temperature protection switch, fuse, failure warning system
Parts Watching window,50mm testing hole,PL internal bulbs,partition plate,dry and wet ball gauze
Optional Parts printer, special port, added shelf, special shelf, PL internal bulbs, dry and wet ball gauze, etc.
Power Supply 1Φ 220VAC±10% 50/60Hz & 3Φ 380VAC±10% 50/60Hz, Specified in order

Features:
Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber

1.*High texture appearance, the body adopted an arc shape, surface matte stripes processing, 
     and flat-handle, easy to operate, safe and reliable.

2.*Rectangular multi layer glass View window, the use of guinea pigs observed in the test window    witt  anti sweat heaters device prevents water gas condensate ,Knot,water droplets,PL fluorescent lamps to keep the inside lighting.

3.*Door bunk isolated airtight packing, can be effectively isolated from the internal temperature of 
the leak

4.*With external water supply system, convenient to supplement the cylinder water supply, and automatic recovery using.

5.*Compressor cycling system used France"Tecumseh"brand which can effectively remove condenser pipe and between  capillary Lubricating oil and whole series adopt environmental protection 
refrigerant
 (R23, R404, R507)

6.*Controller uses the imported LED display screen, can display measured values and setting time  

7.*Controller with multisegment program editor and temperature and humidity can be fast (OUICK)        or slope (SLOP) controlled.

8. *Built in mobile wheels allow easy movement and placed and has a strong positioning screw             position.

Corresponding standard :

  • GB11158 Technical conditions for high-temperature testing box
  • GB10589-89 Technical conditions for low-temperature testing box
  • GB10592-89 Technical conditions for high and low temperature testing box
  • B/T10586-89 technical conditions for humidity testing chamber
  • GB/T2423.1-2001 Low-temperature testing methods
  • GB/T2423.2-2001 High-temperature testing methods
  • B/T2423.3-93 Testing Method for humidity Test Chamber
  • GB/T2423.4-93 Alternating hot and humid testing method
  • GB/T2423.22-2001temperature testing method
  • IEC60068-2-1.1990 low-temperature testing method
  • IEC60068-2-2.1974 high-temperature testing method
  • GJB150.3 high-temperature testing
  • GJB150.4 low-temperature testing
  • GJB150.9 humid testing
Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber

Calibration & Packing & Shipping 
 
1.Strong standard wood case, inner plastic films wrapped for Environmental High low alternating Fast Temperature Change Cycle test Chamber
2. Usually we delivery the equipment by air,by sea or by express. it depends on customer.
 
Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber


Our Services
We are here to help you. Services available:

Replacement manuals

  • Consumables and replacement parts
  • On-site maintenance and repair
  • Warranty support
  • Over-the-phone service support and advice

If you have an OTS chamber  , we will do our best to help you in whatever way we can.  

 Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.

  • Service repair:  We prefer you contact us direct at the factory with any problems you may be experiencing.  We help diagnose the problem, arrange for any needed parts, and schedule a technician to do the repairs.  Rarely can a local contractor get all that done for you as quickly as we can.  We also guarantee the work 

Environmental High Low Alternating Fast Temperature Change Cycle Test Chamber

RFQ:

 Q1 :  Can you customize the product?

   A:   Yes, we can customize any products according to requirements.

Q2 :  How to choose the most suitable products?

   A:   Our professional team will give you the best suggestion,just be  patiently to tell us the information about the parameters your required.

 Q3 :  Can you arrange installations and commissioning in our lab?

   A:   Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
    Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it      Thirdly, some of customized chambers we should to install and teach your team to operate .


 

If you want to know more information...

Please leave a message below and click  " SEND "

Thanks for your time and attention~

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier