Customization: | Available |
---|---|
Application: | Industry, School, Hospital, Lab |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The chamber is cooled electrically with the help of Compressor Cooling coils placed in ribs, on the sides of the chamber; Humidity is maintained with the help of Water Shower Technology. An air-circulating Fan with heater is provided on top of the chamber for even temperature & Humidity distribution. The temperature inside the test chamber is controlled with the help of a PLC. A light tube is also provided in the Chamber to see the samples during conditioning.
Technical parameters of PLC Environmental High Low Temperature Cycling Test Chamber
XB-OTS-49 | XB-OTS-80 | XB-OTS-150 | XB-OTS-225 | XB-OTS-408 | XB-OTS-800 | |
Inner size W*H*DCM |
35*40*35 | 40*50*40 | 50*60*50 | 50*75*60 | 60*85*80 | 100*100*800 |
External size W*H*DCM | 60*105*135 | 90*143*100 | 100*153*110 | 110*168*110 | 130*178*120 | 150*193*140 |
Temperature range | -70°C~+150°C(180°C) (A:-20°C B:-40°C C:-60°C D:-70°C ) |
|||||
Humidity range | 20%~98%R.H.(10%-98%R.H/5%~98%R.H) | |||||
Temp humidity analytic accuracy / uniformity |
±0.1°C;±0.1%R.H./ ±1.0°C;±3.0%R.H.is special optional condition. | |||||
Temperature humidity control accuracy/fluctuation |
±1.0°C;±2.0%R.H./ ±0.5°C;±2.0%R.H. | |||||
Heat/cooling time | About 5.0°C/min;about 1.2°C/min (5~10°C/min is a special optional condition | |||||
Inner and outer materials | SUS#304 Stainless steel for inner chamber and Carton Advanced cold plate nano paint for outer. | |||||
Insulation materials | Resistant to high temp ,high density,formate chlorine,ethyl acetum foam insulation materials | |||||
Cooling system | Air cooling/single segment compressor(-20°C) ,air and water double segment compressor (-40°C~-70°C) |
|||||
Protection devices | Fuse switch, compressor overload switch, refrigerant high and low pressure protection switch, super humidity over-temperature protection switch, fuse, failure warning system |
|||||
Parts | Watching window,50mm testing hole,PL internal bulbs,partition plate,dry and wet ball gauze | |||||
Controller | TEMI" South Korea"TEMI" "OYO" Japan's "OYO" Brand optional | |||||
Compressor | Original France"Tecumseh"brand | |||||
Power | 1Φ 220VAC±10% 50/60Hz & 3Φ 380VAC±10% 50/60Hz |
1.*High texture appearance, the body adopted an arc shape, surface matte stripes processing,
and flat-handle, easy to operate, safe and reliable.
2.*Rectangular multi layer glass View window, the use of guinea pigs observed in the test window witt anti sweat heaters device prevents water gas condensate ,Knot,water droplets,PL fluorescent lamps to keep the inside lighting.
3.*Door bunk isolated airtight packing, can be effectively isolated from the internal temperature of
the leak
4.*With external water supply system, convenient to supplement the cylinder water supply, and automatic recovery using.
5.*Compressor cycling system used France"Tecumseh"brand which can effectively remove condenser pipe and between capillary Lubricating oil and whole series adopt environmental protection
refrigerant (R23, R404, R507)
6.*Controller uses the imported LED display screen, can display measured values and setting time
7.*Controller with multisegment program editor and temperature and humidity can be fast (OUICK) or slope (SLOP) controlled.
8. *Built in mobile wheels allow easy movement and placed and has a strong positioning screw position.
Corresponding standard :
Replacement manuals
If you have an OTS chamber , we will do our best to help you in whatever way we can.
Manuals: PDF files of manuals for current models are available free. Please contact us to request a copy. Older and printed copies at additional charge.
RFQ:
Q1 : Can you customize the product?
A: Yes, we can customize any products according to requirements.
Q2 : How to choose the most suitable products?
A: Our professional team will give you the best suggestion,just be patiently to tell us the information about the parameters your required.
Q3 : Can you arrange installations and commissioning in our lab?
A: Firstly, for standard chamber we had 3-5 days commissioning before shipping , you just need link power in your lab, then can start to operate
Secondly; we had detailed operation manual with chamber , any problems you can find and solve in it
Thirdly, some of customized chambers we should to install and teach your team to operate .
For More Information
please leave a message below